Completed Project

List of Completed Work

Sl No. Description of Work Order Department
01 River dredging from KM 41.000 TO km 44.00=3.00 KM in C/W KalniKushiyara River Management Project under Kishorgonj WD Division during the year 2017-2018 for the Contract price of Tk. 46530376.892 as corrected and modified in accordce with the instructions to Tenderers/Consutants, has been approved by Kishoregong WD Division BDWB Kishoreganj
02 River Dredging from Km 55.79 to Km 70.75 14.96 KM in the Kalni River 35.00 m Bed Width and up to-2.57 m bed level in C/W Kalni Kushiyara River Management Project. Under Kishoreganj WD Division BWDB Kishoreganj DURING THE fy 2017-2018 & 2018-2019 BDWB Kishoreganj
03 Dreedging of Issapur loopcut from Km 53.00 to Km 55.79=2.79 Km inC/W Kalni Kushiyara River Management Project under Kishoreang WD Division, BWDB, Kishoreganj, during the FY 2017-18 & 2018-19 BDWB Kishoreganj
04 De-Siltation of Bed of Matamuhuri river at Hazipara 600m Kaauerbeel 400m Batua 1000m Sakandarpara 500m and Abdul Baripara 500m Total 3.00 Km at upzilla-Chakaria District-Cox’sbazar in connection with Rehabilitation of Damaged polders under the district of Coxs Bazar during the year 2017-2018 BDWB Cox’s Bazar
05 “Dredging work by cutter suction dredger including dredging related works for maintaining navigability from Lohojong turning point to Kathalbari ferry ghat channel & basin area of Shemulia- Kathalbari ferry route Padma for the year 2019-2020 (Gr-01)” BIWTA Mawa
06 “Dredging work by cutter suction dredger including dredging related works for maintaining navigability from Lohojong turning point to Kathalbari ferry ghat channel & basin area of Shemulia- Kathalbari ferry route Padma for the year 2019-2020 (Gr-02)” BIWTA Mawa
07 “Emergency Dredging of Submersible char of Padma River in Between km 0.150 to km 0.250 = 100 m under Sariatpur O&M Division, BWDB, Sariatpur during the year 2018-2019” BWDB Sariatpur
08 “Emergency Dredging of Submersible char of Padma River in Between km 0.420 to km 0.515 = 95 m under Shariatpur O&M Division, BWDB, Shariatpur during the year 2018-2019” BWDB Sariatpur
09 “Emergency Dredging of Submersible char of Padma River in Between km 0.515 to km 0.585 = 70 m under Shariatpur O&M Division, BWDB, Shariatpur during the year 2018-2019” BWDB Sariatpur
10 “Emergency Dredging of Submersible char of Padma River in Between km 0.335 to km 0.420 = 85 m under Shariatpur O&M Division, BWDB, Shariatpur during the year 2018-2019” BWDB Sariatpur
11 “Emergency Dredging of Submersible char of Padma River in Between km 0.585 to km 0.700 = 115 m under Shariatpur O&M Division, BWDB, Shariatpur during the year 2018-2019” BWDB Sariatpur
12 “Emergency Dredging of Submersible char of Padma River in Between km 0.000 to km 0.150 = 150 m under Shariatpur O&M Division, BWDB, Shariatpur during the year 2018-2019” BWDB Sariatpur
13 “Emergency Dredging of Submersible char of Padma River in Between km 0.250 to km 0.335 = 85 m under Shariatpur O&M Division, BWDB, Shariatpur during the year 2018-2019” BWDB Sariatpur
14 Dredging work by cutter suction dredger including dredging related works for developeing 4avigability of Madaripur-KabirajpurChowdhuryhat/Peajkhali Charjanajat/Kaorakandi river route from Chandrapara to Beparikandi in the river Arialkhan (Lot-01) BIWTA Madaripur-Kabirajpur
15 De-Siltation of Bed of Matamuhuri river at Hazipara 600m Kaauerbeel 400m Batua 1000m Sakandarpara 500m and Abdul Baripara 500m Total 3.00 Km at upzilla-Chakaria District-Cox’sbazar in connection with Rehabilitation of Damaged polders under the district of Coxs Bazar during the year 2017-2018 BDWB Cox’s Bazar
16 Dredging Work by cutter suction dredger for improving Navigability of 4avigabilit Daudkandi river route in the river gomti. BIWTA Daudkandi
17 Dredging Work by cutter suction dredger for improving Navigability of surma river from khaliajuri to sonarampur B. Baria area of BhairabChatak river route (Lot-04) BIWTA Bhairab-Chatak
18 Dredging of Char in Arial Khan River from KM 0.000 to KM 1.300= 1300.00m at Duair Darga Bazar in C/W Bank Protective Work & Dredging in Arial Khan River in Faridpur District under Faridpur O&M Division BWDB Faridpur during the year 2019-20 & 2020-21. BWDB Faridpur
19 Dredging of Char in Arial Khan River from KM 0.000 to KM 1.500= 1500.00m at Charbondorkhola Fazil Madrasha in C/W Bank Protective Work & Dredging in Arial Khan River in Faridpur District under Faridpur O&M Division, BWDB, Faridpur during the year 2019-20 & 2020-21. BWDB Faridpur
20 Dredging of Char in Padma River from KM 1.000 to KM 2.000 = 1.000 KM at Chor Hossainpur in C/W “Bank Protective Work & Dredging Project along the Right Bank of Padma River in Upazilka: Charbhadrasion, District: Faridpur” under Faridpur O & M Division, BWDB, Faridpur during the year 2019-20 & 2020-21. BWDB Faridpur
21 Dredging work by cutter suction dredger including dredging related works for developeing 5avigability of Madaripur-KabirajpurChowdhuryhat/Peajkhali Charjanajat/Kaorakandi river route from Chandrapara to Beparikandi in the river Arialkhan (Lot-01) BIWTA Ariakhan-01
22 Capital Dredging of Sangu River at different locations in between KM 24.261 to KM 25.582 (= 1.321 km) in Upazila-Satkania, Dist: Chattogram under the Project Chittagong O&M Division-1, BWDB. BWDB Chittagong
23 Capital Dredging of Sangu River at different locations in between KM 25.582 to KM 28.250 (= 2.668 km) in Upazila-Satkania, Dist: Chattogram under the Project Project Chittagong O&M Division-1, BWDB. BWDB Chittagong
24 Dredging work by cutter suction dredger for improving navigability of Bholaganj-Chhath river route (Lot-05). BIWTA